NEWS
21-04-2011 | Sanded and Lacquered Bar Area - David Lloyd Leisure - Blackheath London SE3
David Lloyd Leisure. Blackheath. London. SE3
The Cheery Bar and Service Till.
Where chemically stripped of all degraded surface, neutralized , sanded and prepared all round for sealing in a Polyurethane Lacquer 70% sheen.
The bespoke seating area was upholstered in Brown Putty Leather and woodwork was sprayed onsite in White Lichen Precat Lacquer 25% sheen.
This project took 7 days to complete.
The Cheery Bar and Service Till.
Where chemically stripped of all degraded surface, neutralized , sanded and prepared all round for sealing in a Polyurethane Lacquer 70% sheen.
The bespoke seating area was upholstered in Brown Putty Leather and woodwork was sprayed onsite in White Lichen Precat Lacquer 25% sheen.
This project took 7 days to complete.